The UK biomass industry is constantly trying to find ways to counter the current low fossil fuel costs, along with an ever changing and decreasing RHI subsidy. Increasingly this means burning lower grade, and lower cost fuels, but not all boilers are created equal… Low fuel quality means more material derived from the building and construction industry, causing variability in particle size, chemical makeup and moisture content & not all boilers are up to the challenge.

In order to meet UK emissions levels, and gain an RHI certificate on Grade B fuel, all a boiler has to do is prove that it can but the material in question whilst keeping the emissions as clean as possible. This however does not guarantee that the boiler itself is not sustaining damage, severely limiting its lifespan. Whilst some manufacturers have carried out the most basic testing allowed, Froling have taken the unusual step of carrying out extensive tests on the welfare of the boiler as well as the all important emissions levels. All this means that the boiler maintains its industry leading warranty as Froling are happy that their industrial boilers are able to cope with the added perils of Grade A & B recycled fuels.



Turn Key Drying Floor, Heat Exchangers & Ducting

Originally only brought into the project to supply the heat exchanger & fan units, Brimble were approached to design and quote for the full set of four drying floors and ducting because of issues with the previously appointed contractor. Impressed by the technical expertise shown during the quotation and design stage the project was won & our team of specialist contractors got to work producing fully functioning forced air drying floors in under four weeks. Fitting the floors into existing space and a requirement to utilise the mezzanine floor provided plenty of unique problems, but with some innovative solutions the floor was handed over on time and on budget.

What equipment did we supply:

8no. 500kW tube and fin, water to air heat exchangers

8no. Industrial fan units, skid mounted to PHE

4no. Forced air static drying floors with full duct work package

Project Duration:

4 weeks

 

 

 


Headquarters

1 The Leaze
Woolverton
Somerset
BA2 7QR

01373 831 052

info@brimblemail.com

Installer Network



Find your local installer.


findinstaller@brimblemail.com


Follow Our Activity

Keep track on social media.