4MW Chip drying floors, fans & ducting

Turn Key Drying Floor, Heat Exchangers & Ducting

Originally only brought into the project to supply the heat exchanger & fan units, Brimble were approached to design and quote for the full set of four drying floors and ducting because of issues with the previously appointed contractor. Impressed by the technical expertise shown during the quotation and design stage the project was won & our team of specialist contractors got to work producing fully functioning forced air drying floors in under four weeks. Fitting the floors into existing space and a requirement to utilise the mezzanine floor provided plenty of unique problems, but with some innovative solutions the floor was handed over on time and on budget.

What equipment did we supply:

8no. 500kW tube and fin, water to air heat exchangers

8no. Industrial fan units, skid mounted to PHE

4no. Forced air static drying floors with full duct work package

Project Duration:

4 weeks

 

 

 

Headquarters

1 The Leaze
Woolverton
Somerset
BA2 7QR

01373 831 052

info@brimblemail.com

Installer Network



Find your local installer.


findinstaller@brimblemail.com


Follow Our Activity

Keep track on social media.